Venues foundation for artificial grass play a crucial role


artificial grass solutions

artificial grass is widely used in sports stadiums, leisure courtyard, rooftop garden, park, kindergarten, playground, swimming pool, racecourse, airport, highway isolation with other places, it is with people's lives, leisure lot of very important The contact should be laying Note:

1, base. Venues foundation for artificial grass play a crucial role. Flatness, stability and drainage of the site based on the effect of the use of the artificial grass venue will affect.

artificial grass

Actinomycetes. Identify venues center point to fixed site on the exact location of the point, line, according to the center point. Reference sports venues field deployment site marking, drawing graphic design and effect diagram, match the performance and the thickness of the artificial grass.
3, based processing, repair, clean-up. The artificial grass moved into the site along the lateral edge direction to spread, and sequentially from one end of the longitudinal edges of advance to the additional information about one end. artificial grass to be used by professionals specialized tools laying. Into the material to reach the construction site, in accordance with the requirements of the drawings, by construction workers cutting, each lawn seams mouth coated with a special interface with glue connection or using a special machine sewing together as a whole, the entire lawn. Installation requires air humidity can not be too large, to avoid the rainy or foggy weather construction.
4, will be prepared in the artificial grass outside the white grass lines cut, placed side stand.
5, the green artificial grass seams lap 2cm ~ 3cm, with cut grass cutter or knife cut on both sides of the lawn as possible lap close.
6, 20cm ~ 30cm wide fiber cloth or nonwoven fabric along the artificial grass seams spread, if it is wet with water, the need sulfate, and then drying a certain time so that the special glue evenly coated on the fiber cloth, pieced together from then on both sides of the lawn, adhesive fiber cloth. If you put together at the gap may be in addition to every 2cm ~ 5cm cut a stretch to the interface at to ensure beautiful appearance.
7, in the the artificial grass splicing After again PULL fix the individual function lines of the venue, the location of the point, to the cutter cut out of the cut wire grass into the fiber cloth, coated special glue originally preparatory The good white wire grass back cementation pressed. Arcs in the corner narrow area difficult the whole corner area removed, cut into small pieces, block by block back into the stitching together.
8, Artificial Grass splicing After, on wipe off portion to the cutter opening straightened docking removal of the overlapping portion, and then cemented
9 all dealt with sand filling machine Note sand Note colloidal particles, bristles. Artificial grass filling quartz sand, quartz sand hidden in the grass roots of the silk, and play a role in protecting the turf. And quartz sand evenly spread over the rubber particles. Filling the quartz sand and the thickness of the rubber particles according to the different heights of the lawn, depending on requirements of the rubber particles is less than about wire grass surface about 10mm.
10, clean up the site, check the site specific size, strict inspection lawn bonding is firmly deal with the phenomenon of uneven quartz sand and rubber particles layer, and finally completed.